|
May 8
8:00 am - 4:00 pm
Knoxville Marriott
Workshop 4
Preventive Maintenance (PM)/Predictive Maintenance (PdM) - Striking
the right balance
Most companies that have implemented a condition monitoring program,
have overlaid the predictive maintenance program (PdM) onto the
preventive maintenance (PM) program. This usually creates a lot of
unnecessary work and in some cases, creates a scenario where more harm
is done than good. This class will demonstrate how these problems are
created and can be avoided by finding the right mixture of PM and PdM.
Having learned about the inefficiencies that can be introduced into a
maintenance strategy with a poorly constructed PM/PdM program in the
morning session, this session will be dedicated to techniques that can
be employed to analyze and correct this specific situation. Preventive
maintenance evaluation (PME) is a technique that allows the analysis of
PM tasks for the purpose of separating them into value added and
non-value added categories. After the PME has been completed, the
optimization of the remaining tasks must be performed. This session
will demonstrate several techniques for re-engineering those tasks into
a format that provides clarity and encourages consistency of execution.
Each workshop participant will get:
-
Manual PM Evaluation (PME) Exercise
-
Job Plan Mapping Exercise
-
PME Flow / Procedure Hierarchy &
Procedure Step Poster
This training event is
available at no cost for members of the Association for Maintenance
Professionals. Click here to
joinSpace is
limited and pre-registration is required |